LOCATION Oamaru Reservoir    PRINCIPAL Oamaru District Council   PROJECT DATES May 2020 to February 2021

Construction and commissioning of the new 8700m3 Oamaru Reservoir (43m dia x 9m high tank).  The reservoir was constructed next to an existing reservoir, and the water is ozone treated.

Quality: The tank consisted of a single pour post tensioned floor, precast pre tensioned wall panels (post tensioned horizontally), precast beams/columns and roof slabs. All pipe work and fittings were Grade 316 stainless steel, and varied between 450 and 600mm in diameter. Fittings included Rotork actuators, Viking Johnson couplers, bellows, Shand and Jurs 94060 FRP conservation vents & EH Level transducers.  All works were completed in accordance with our ISO9001 accreditation, QA and Commissioning Plan.  All products fitted and interacted seamlessly.

Programme: The project was completed within the expected timeframe.

Health & Safety: A site specific Health and Safety Management Plan was implemented and observed in accordance with the company’s requirements. No workplace accidents were recorded.

Environmental: All required and appropriate environmental protection and mitigation measures were followed in accordance with the consent conditions and the project specific Environmental Management Plan.