Design and refurbishment of a 100m long wharf. Works included timber pile repairs, timber bent replacement and refurbishment, sheet-piling, tie beams & deadmen, engineered fill, insitu concrete suspended deck and concrete pavement. Works also included demolition of 50m of the existing wharf....

Construction of a 146m long, 3 No x 46m spans, fabricated steel I beams c/w thermal metal arc spray, and a precast concrete deck. CSL offered the client a precast alternative to the insitu concrete deck, which shortened the construction period by 9 weeks....

Design and construction of a 36m long single span bridge over the Pakihi River. Works included construction of abutment piles, supply and installation of structural steel and supply and install precast deck and insitu deck topping slab....