Design and construction of a bridge for vehicular crossing of the Aorere River, to replace the previous bridge swept away in the 2010 flood. The bridge was a single lane concrete deck bridge with a 60m span through truss superstructure, including guardrails and approaches....

Design and construction of a 36m long single span bridge over the Pakihi River. Works included construction of abutment piles, supply and installation of structural steel and supply and install precast deck and insitu deck topping slab....