Te Mihi Culverts

LOCATION Te Mihi Power Station, Taupo    PRINCIPAL Contact Energy Limited   PROJECT DATES March 2012 to May 2012

Supply and Installation of 18.0 lineal metres of 4.0 x 2.0m box culverts.

Programme:  The project was completed within the agreed time frame, however the installation period had to be extended due to changes in the programming and scope of the project.

Budget:  The project was completed at the quoted price.

Quality:  CSL’s Quality management system was implemented throughout the manufacture and installation of the culverts. A Quality Management plan was produced and there were no non-conformances reported.

Health & Safety:  A site specific Safety Management plan was produced and implemented for the site works. CSL also had to comply with the broader site wide safety procedures enforced on site by the joint venture. There were no incidents reported.

Public Relations & Cooperative team approach:  The completion of the site works on a large geothermal construction site with multiple subcontractors working adjacent to one another required a high level of co-operation, planning and open communication to ensure works went ahead within the timeframes.

VIEW MORE PROJECTS: