Foster Stock Underpass

LOCATION Gavin Road, Rerewhakaaitu    PRINCIPAL Rob Foster   PROJECT DATES December 2011 to January 2012

Design, Manufacture and Construction of a 18.0m long x 3.0m wide x 2.0m high stock underpass, with timber handrails. Resurfacing and resealing of the road.

Programme:  The project was completed within the specified time frame and at the quoted price.

Quality:  CSL’s Quality Management system was implemented from the manufacture of the precast components right through to the installation of the underpass onsite. There were nil non conformances or remedial works required.

Health & Safety:  CSL’s produced a site specific Safety Management Plan for this project. There were no incidents on site regarding Health and Safety.

Traffic Management:  A specific traffic management plan was produced.  The project required that the rural road be closed for a period of 12 hours and a diversion was set up to allow traffic flow around the construction works through adjacent farmland.  Traffic Management was provided by Traffic Management NZ. There were no traffic incidents.