Construction a new 50,000m² shopping mall in Silverdale, Auckland.Works involved all earthworks, all concrete foundations, structural steel, flooring, roofing, manufacture, delivery and erection of all precast units. The mall contains 37 tenancies, with Farmers being the anchor tenant. ...

Manufacture three Precast Stair Flights with Cast in Edge Beams. The stairs are 3440mm wide, consisting of 13 rises, of 180mm rise & 330mm tread, with a drainage channel down one side. ...

Construction of a 100m long overbridge which joins Wigram Rd and Magdala Pl. Works involved the construction of a seismically low damage bridge which required an Innovative approach to construction and is the first bridge in the world to adopt this low-damage technology....

Bridge widening of the Historic 1925 Gladstone Bridge (originally built using wood in 1885). A 1.5m widening to provide a shared path using prefabricated cantilevered concrete slabs.  The 1.5m widening extends the width to create a 3m shared cycle and pedestrian path. ...

Design and construction of rail and road bridges as part of the SH2 realignment at Tutira, north of Napier. The rail-over-road bridge consisted of a 40m concrete structure, utilising precast walls and roof with an insitu topping. ...

Description: Construction of a new 55,000m² Distribution Centre in East Tamaki, Auckland, for Farmers Trading Company. Works included all excavations, all foundation works, 346 driven piles up to 22m long, manufacture, supply and erection of various pre-cast panels, beams, columns, double T’s and stairs,...