23 Aug Ports of Auckland Barriers
Manufacture, Delivery and Installation of 340 Precast Concrete Barriers with Painted top fence panel for Ports of Auckland. ...
Manufacture, Delivery and Installation of 340 Precast Concrete Barriers with Painted top fence panel for Ports of Auckland. ...
Construction of a new pedestrian and cycle bridge across the Manawatu River, spanning approximately 195m and width of 4.5m. The bridge construction involves earthworks, piling, and alterations to the stop banks with temporary diversion of the river to build the bridge piers....
Construction of two new timber shared pathways for pedestrians and cyclists on Prebensen Drive and Taradale Road. Install barrier, timber posts and rail with steel frame inserts. ...
Design and construction of a 300m long, 10 x 30m span bridge over the Ashely River. Permanent cased bored piles and approach works....
Bridge widening of the Historic 1925 Gladstone Bridge (originally built using wood in 1885). A 1.5m widening to provide a shared path using prefabricated cantilevered concrete slabs. The 1.5m widening extends the width to create a 3m shared cycle and pedestrian path. ...
Construction of two 22.7m span bridges over the Utuhina stream - abutments, wingwalls, steel driven piles, hollow core beams, barriers and handrails. Supply and installation of precast box culverts....
Construction of a new bridge located adjacent, parallel and downstream of the existing Wharekahika Bridge. Work associated with the new bridge construction included site clearing, excavating and filling, bridge construction, guardrail over bridge....
Design and construction of a 21m single span cycleway bridge and approaches, forming part of the national cycleway project. The bridge was constructed with steel driven piles, reinforced concrete abutments, structural steel beams and a timber deck and handrails....
Design and construction of rail and road bridges as part of the SH2 realignment at Tutira, north of Napier. The rail-over-road bridge consisted of a 40m concrete structure, utilising precast walls and roof with an insitu topping. ...
The project works included the rising of the right abutment of the weir, re-contouring of the upstream and downstream approaches to this abutment, widening of the river channel and construction of a single lane concrete farm bridge. Due to adverse weather conditions the project works...