Construction of a new Clarifier structure at Pines WWTP in Selwyn. The structure consisted of a 30m diameter x 7m high concrete tank with a reinforced segmental concrete floor slab, prestressed precast panels/in-situ joints, post tensioned walls and an in-situ launder box and outlet...

Construction of a 26m long Single span hollow core bridge over Tidal Creek Stream, Karamea. Works included construction of a 32m span temporary road bridge, Demolition of the existing bridge structure, installation of 14no. Driven steel UC Piles (15m deep), in-situ bridge abutments, manufacture and...