19 Aug Oamaru Reservoir
Construction and commissioning of the new 8700m3 Oamaru Reservoir. The reservoir was constructed next to an existing reservoir, and the water is ozone treated....
Construction and commissioning of the new 8700m3 Oamaru Reservoir. The reservoir was constructed next to an existing reservoir, and the water is ozone treated....
Construction of a 500m3 (11m dia x 7m high) concrete reservoir, assoc. water reticulation pipework & valving, electrical, commissioning and strengthening of the existing reservoir....
Design and Construction of a new 1300m3 water reservoir in Bulls, along with seismic strengthening of the existing Bulls mushroom shaped water tower....