Manufactured 1000t stressing bed and mould at our Hastings Precast Plant. Manufactured and supplied 90No Super Tee Bridge Beams up to 25m long and 30t weight. Also included sundry precast items such as DHC Beams, stairs etc....

Construction of a 58m long, 45 degree skewed precast and insitu reinforced concrete bridge over the Leith River as part of the State Highway 88 Realignment Project.  Works included construction of 1.5m diameter permanent cased wet tremmied poured abutment piles, supply and installation of 18no...