Glen Bridge Piling & Super Tee Supply

LOCATION NZ Transport Agency    PRINCIPAL Caversham Highway, Dunedin   PROJECT DATES May 2011 to September 2011

Supply and Installation of Super Tee precast beams and the Construction of insitu concrete bored piles for the new Glen Bridge as part of the Caversham Highway Project.  Works included construction of 0.6m – 1.8m diameter up to 25m deep permanent cased piles including rock sockets and the supply of 19no (up to 30m long) Super Tee precast beams.

Programme:  The project was completed within the allocated project timeframe.

Budget:  The project was completed within the tendered price.

Quality:  A CSL Project Quality Plan was produced and followed in accordance with our ISO9001 certification. There were no significant defects of remedial works required.

Health & Safety:  Health and Safety Plan implemented and observed in accordance with the company’s secondary level requirements for ACC WSMP. There were zero LTIs or serious incidents.

Environmental:  CSL was committed to providing comprehensive Environmental Management throughout the project. Appropriate environmental protection measures, such as silt traps, spill procedures and careful management of construction materials ensured that all activities were safely carried out within the environmental requirements of the Building Consent. There were no environmental incidents on this project.

Traffic Management:  A specific traffic management plan was produced to control the movement of site traffic and machinery for this project.

Public Relations & Cooperative team approach:  CSL had a good rapport with the main contractor, associated subcontractors and stakeholders. Work was well planned to minimize the impact on other operations within the site.

Management/Administration:  All aspects of management requirements were met including reporting, communications, financial control and risk management.

VIEW MORE PROJECTS: