Breakwater Renovations

LOCATION Eastland Port, Gisborne   PRINCIPAL Eastland Port Limited   PROJECT DATES March 2011 to August 2011

Rehabilitation of the concrete mass block and sheet piling of the main breakwater at the harbour of Eastland Port, Gisborne.

Programme:  The project was completed within the nominated 26 week time period.

Quality:  The project Quality Management Plan was drawn up and observed in accordance with the company’s AS/NZS ISO 9001:2008 certification. There were non-conformances reported and minimal remedial works were required.

Health & Safety:  A site specific Health and Safety Plan was implemented and observed in accordance with the company’s secondary level requirements for ACC WSMP. This met all obligations as required by Eastland Port Health & Safety operational requirements.  There were zero LTIs or serious incidents.

Management:  The Contractors area was isolated from the public by way of security fencing and display of warning signage. Laydown areas for storage of materials were carefully selected to minimise disturbance and provide the safest access.