Construction of a 26m long Single span hollow core bridge over Tidal Creek Stream, Karamea. Works included construction of a 32m span temporary road bridge, Demolition of the existing bridge structure, installation of 14no. Driven steel UC Piles (15m deep), in-situ bridge abutments, manufacture and...

Design and construction of rail and road bridges as part of the SH2 realignment at Tutira, north of Napier. The rail-over-road bridge consisted of a 40m concrete structure, utilising precast walls and roof with an insitu topping. ...

Construction of two new timber shared pathways for pedestrians and cyclists on Prebensen Drive and Taradale Road. Install barrier, timber posts and rail with steel frame inserts. ...

Construction a new 50,000m² shopping mall in Silverdale, Auckland.Works involved all earthworks, all concrete foundations, structural steel, flooring, roofing, manufacture, delivery and erection of all precast units. The mall contains 37 tenancies, with Farmers being the anchor tenant. ...