Construction of two new timber shared pathways for pedestrians and cyclists on Prebensen Drive and Taradale Road. Install barrier, timber posts and rail with steel frame inserts. ...

Construction a new 50,000m² shopping mall in Silverdale, Auckland.Works involved all earthworks, all concrete foundations, structural steel, flooring, roofing, manufacture, delivery and erection of all precast units. The mall contains 37 tenancies, with Farmers being the anchor tenant. ...

Construction of a 100m long overbridge which joins Wigram Rd and Magdala Pl. Works involved the construction of a seismically low damage bridge which required an Innovative approach to construction and is the first bridge in the world to adopt this low-damage technology....

Bridge widening of the Historic 1925 Gladstone Bridge (originally built using wood in 1885). A 1.5m widening to provide a shared path using prefabricated cantilevered concrete slabs.  The 1.5m widening extends the width to create a 3m shared cycle and pedestrian path. ...

Construction of a new bridge located adjacent, parallel and downstream of the existing Wharekahika Bridge.  Work associated with the new bridge construction included site clearing, excavating and filling, bridge construction, guardrail over bridge....

Design and construction of a 21m single span cycleway bridge and approaches, forming part of the national cycleway project. The bridge was constructed with steel driven piles, reinforced concrete abutments, structural steel beams and a timber deck and handrails....

Design and construction of rail and road bridges as part of the SH2 realignment at Tutira, north of Napier. The rail-over-road bridge consisted of a 40m concrete structure, utilising precast walls and roof with an insitu topping. ...