Construction a new 50,000m² shopping mall in Silverdale, Auckland.Works involved all earthworks, all concrete foundations, structural steel, flooring, roofing, manufacture, delivery and erection of all precast units. The mall contains 37 tenancies, with Farmers being the anchor tenant. ...

Replacement of a live rail bridge: 40m long two span steel beam bridge on the east coast main trunk line over a sensitive waterway. Works included the construction of 6 x 1200Ø x 33m deep permanent cased bored piles with bottom driven plugs and insitu...

The construction of a 20 x 18 x 7m deep in-ground concrete structure for a pump station. The scope included the installation and extraction of a sheet pile cofferdam, a 7m deep wet excavation into a live aquifer, 2m thick tremie poured concrete plug, insitu...

The Waimakariri R501 Bridge had been undermined through scouring of the riverbed to such an extent that during the flood periods the bridge had to be closed to all traffic. The project required the strengthening of six piers to allow the bridge to remain open...

The contract involved the construction of new reinforced concrete piers, consisting of 10 bored piles with driven precast cap, and the dismantling of existing timber piers....

Design and construction of a bridge for vehicular crossing of the Aorere River, to replace the previous bridge swept away in the 2010 flood. The bridge was a single lane concrete deck bridge with a 60m span through truss superstructure, including guardrails and approaches....