19 Aug Pyramid Bridge Replacement
Design and Build new 75m, 3 span, single hollowcore bridge over the Mataura River in Gore....
Design and Build new 75m, 3 span, single hollowcore bridge over the Mataura River in Gore....
Construction of a new pedestrian and cycle bridge across the Manawatu River, spanning approximately 195m and width of 4.5m. The bridge construction involves earthworks, piling, and alterations to the stop banks with temporary diversion of the river to build the bridge piers....
Construction a new 50,000m² shopping mall in Silverdale, Auckland.Works involved all earthworks, all concrete foundations, structural steel, flooring, roofing, manufacture, delivery and erection of all precast units. The mall contains 37 tenancies, with Farmers being the anchor tenant. ...
Construction of two 22.7m span bridges over the Utuhina stream - abutments, wingwalls, steel driven piles, hollow core beams, barriers and handrails. Supply and installation of precast box culverts....
Replacement of a live rail bridge: 40m long two span steel beam bridge on the east coast main trunk line over a sensitive waterway. Works included the construction of 6 x 1200Ø x 33m deep permanent cased bored piles with bottom driven plugs and insitu...
The construction of a 20 x 18 x 7m deep in-ground concrete structure for a pump station. The scope included the installation and extraction of a sheet pile cofferdam, a 7m deep wet excavation into a live aquifer, 2m thick tremie poured concrete plug, insitu...
Supply and Installation of Super Tee precast beams and the Construction of insitu concrete bored piles for the new Glen Bridge as part of the Caversham Highway Project. Works included construction of 0.6m - 1.8m diameter up to 25m deep permanent cased piles including rock...
The Waimakariri R501 Bridge had been undermined through scouring of the riverbed to such an extent that during the flood periods the bridge had to be closed to all traffic. The project required the strengthening of six piers to allow the bridge to remain open...
Rehabilitation of the concrete mass block and sheet piling of the main breakwater at the harbour of Eastland Port, Gisborne....
The contract involved the construction of new reinforced concrete piers, consisting of 10 bored piles with driven precast cap, and the dismantling of existing timber piers....