Construction of a 26m long Single span hollow core bridge over Tidal Creek Stream, Karamea. Works included construction of a 32m span temporary road bridge, Demolition of the existing bridge structure, installation of 14no. Driven steel UC Piles (15m deep), in-situ bridge abutments, manufacture and...

Construction of two new timber shared pathways for pedestrians and cyclists on Prebensen Drive and Taradale Road. Install barrier, timber posts and rail with steel frame inserts. ...

Construction a new 50,000m² shopping mall in Silverdale, Auckland.Works involved all earthworks, all concrete foundations, structural steel, flooring, roofing, manufacture, delivery and erection of all precast units. The mall contains 37 tenancies, with Farmers being the anchor tenant. ...

Construction of a 100m long overbridge which joins Wigram Rd and Magdala Pl. Works involved the construction of a seismically low damage bridge which required an Innovative approach to construction and is the first bridge in the world to adopt this low-damage technology....

Construction of a new bridge located adjacent, parallel and downstream of the existing Wharekahika Bridge.  Work associated with the new bridge construction included site clearing, excavating and filling, bridge construction, guardrail over bridge....