Design and construction of two 100m long x 3 span bridges over the Mangawhero River, 250,000m³ of earthworks including 60,000m³ of rock excavation. Works also included the design and build of two reinforced earth retaining walls up to 12m high, 1.6km of pavement and associated...

The construction of a 20 x 18 x 7m deep in-ground concrete structure for a pump station. The scope included the installation and extraction of a sheet pile cofferdam, a 7m deep wet excavation into a live aquifer, 2m thick tremie poured concrete plug, insitu...

This project involved the manufacture of piles adjacent to an existing and fully operational wharf. The project was completed on time, under budget, encountered no problems with health and safety and met the environmental and consent conditions imposed....

Installation of 19.5m of sheet pile retaining wall structure on the right bank of the Waikato River below the control gate bridge. The sheet piling was hardfill backfilled at a constant slope from the river bank to a bench on the river edge....

The supply and installation of 30 sheet piles driven 1m into the riverbed with a 50t crane and vibro hammer for the construction of a retaining wall (including anchor blocks and tiebacks) to control erosion on the Waikato River at Taupo Control Gates.  Works also...

The contract involved the construction of new reinforced concrete piers, consisting of 10 bored piles with driven precast cap, and the dismantling of existing timber piers....

Construction of a 58m long, 45 degree skewed precast and insitu reinforced concrete bridge over the Leith River as part of the State Highway 88 Realignment Project.  Works included construction of 1.5m diameter permanent cased wet tremmied poured abutment piles, supply and installation of 18no...