16 Aug POA Pedestrian Underpass
Design and construction of a new 73m single level underground tunnel for pedestrian access, 2m below the water table, passing under a major port arterial road....
Design and construction of a new 73m single level underground tunnel for pedestrian access, 2m below the water table, passing under a major port arterial road....
Construction of a new pedestrian and cycle bridge across the Manawatu River, spanning approximately 195m and width of 4.5m. The bridge construction involves earthworks, piling, and alterations to the stop banks with temporary diversion of the river to build the bridge piers....
Construction of a 100m long overbridge which joins Wigram Rd and Magdala Pl. Works involved the construction of a seismically low damage bridge which required an Innovative approach to construction and is the first bridge in the world to adopt this low-damage technology....
Bridge widening of the Historic 1925 Gladstone Bridge (originally built using wood in 1885). A 1.5m widening to provide a shared path using prefabricated cantilevered concrete slabs. The 1.5m widening extends the width to create a 3m shared cycle and pedestrian path. ...
Replacement of a live rail bridge: 40m long two span steel beam bridge on the east coast main trunk line over a sensitive waterway. Works included the construction of 6 x 1200Ø x 33m deep permanent cased bored piles with bottom driven plugs and insitu...
The project works included the rising of the right abutment of the weir, re-contouring of the upstream and downstream approaches to this abutment, widening of the river channel and construction of a single lane concrete farm bridge. Due to adverse weather conditions the project works...
Design and construction of two 100m long x 3 span bridges over the Mangawhero River, 250,000m³ of earthworks including 60,000m³ of rock excavation. Works also included the design and build of two reinforced earth retaining walls up to 12m high, 1.6km of pavement and associated...
Design and construction of an 85m long network arch bridge with precast/insitu reinforced concrete deck over the Whangaheu River. Works included construction of 0.9m diameter permanent cased abutment piles, supply and installation of structural steel, supply and install precast deck and insitu deck topping slab....
Design and construction of a 90m long arch bridge over an existing waterway. Works included insitu concrete abutments, 600 dia x 35m long bottom driven steel tube piles, new road realignment involving 1500m2 of pavement/seal, associated earthworks, drainage and significant traffic control....