Design and construction of two 100m long x 3 span bridges over the Mangawhero River, 250,000m³ of earthworks including 60,000m³ of rock excavation. Works also included the design and build of two reinforced earth retaining walls up to 12m high, 1.6km of pavement and associated...

Design and construction of an 85m long network arch bridge with precast/insitu reinforced concrete deck over the Whangaheu River.  Works included construction of 0.9m diameter permanent cased abutment piles, supply and installation of structural steel, supply and install precast deck and insitu deck topping slab....

Design and construction of a 90m long arch bridge over an existing waterway. Works included insitu concrete abutments, 600 dia x 35m long bottom driven steel tube piles, new road realignment involving 1500m2 of pavement/seal, associated earthworks, drainage and significant traffic control....