Te Aroha Reservoir

LOCATION Miro Street, Te Aroha    PRINCIPAL Matamata Piako District Council   PROJECT DATES March 2005 to January 2006

Design and Build contract for a Potable Water Reservoir of 5,000m3 capacity.

The design process was managed by CSL who reported directly to the Client. CSL produced a Quality Plan, and Health & Safety Plan in accordance with our ISO9001:2008 accreditation and ACC WSMP requirements. All checks, inspections and testing were carried out and there were no incidents or remedial works required.

Programme: The project was completed within the contract period and estimated budget.

Co-operative Team Environment: CSL won this Design and Build Contract in an open competitive tender. We managed the design process, then built and water tested the Reservoir, all in accordance with the Principal’s requirements. This project ran smoothly and concluded with no variations or disputes. This meant the Client’s involvement in the Contract was minimal.

VIEW MORE PROJECTS: