Manufacture and Delivery of 191 Precast Concrete Wall Panels for the construction of Workshops and Office Buildings at the new 22ha. Porter Development in Hamilton.  A total of 3275m² of concrete was required for the precast wall panels. The 8,000m² building forms the new Global...

Construction a new 50,000m² shopping mall in Silverdale, Auckland.Works involved all earthworks, all concrete foundations, structural steel, flooring, roofing, manufacture, delivery and erection of all precast units. The mall contains 37 tenancies, with Farmers being the anchor tenant. ...

Description: Construction of a new 55,000m² Distribution Centre in East Tamaki, Auckland, for Farmers Trading Company. Works included all excavations, all foundation works, 346 driven piles up to 22m long, manufacture, supply and erection of various pre-cast panels, beams, columns, double T’s and stairs,...

Design and Construction of a circular prestressed, post tensioned 9m high, 30m diameter water retaining structure, including all associated pipe work, safety ladders, site drainage and sundry works.  The project was completed within the anticipated contract period of 40 weeks and within the contract budget....

The Whakapapa Intake forms part of the Turangi Power Scheme and was constructed in the 1960’s. Over the years, the stilling basin apron suffered hydraulic erosion to the concrete. The works required the dewatering of the river and the construction of a 300m3 concrete overlay....

Design, Construction and Commissioning of a new 1mL reinforced concrete Water Reservoir including a 7m x 5m reinforced Concrete Pumphouse.  Works also included Installation of a 180m BGL bore and booster pumps within the new Pump House.Installation of PVC-U potable water pipelines and associated flow...