Bridge widening of the Historic 1925 Gladstone Bridge (originally built using wood in 1885). A 1.5m widening to provide a shared path using prefabricated cantilevered concrete slabs.  The 1.5m widening extends the width to create a 3m shared cycle and pedestrian path. ...

Design and construction of rail and road bridges as part of the SH2 realignment at Tutira, north of Napier. The rail-over-road bridge consisted of a 40m concrete structure, utilising precast walls and roof with an insitu topping. ...

Design and construction of an 85m long network arch bridge with precast/insitu reinforced concrete deck over the Whangaheu River.  Works included construction of 0.9m diameter permanent cased abutment piles, supply and installation of structural steel, supply and install precast deck and insitu deck topping slab....

Construction of a 146m long, 3 No x 46m spans, fabricated steel I beams c/w thermal metal arc spray, and a precast concrete deck. CSL offered the client a precast alternative to the insitu concrete deck, which shortened the construction period by 9 weeks....

Design and construction of a bridge for vehicular crossing of the Aorere River, to replace the previous bridge swept away in the 2010 flood. The bridge was a single lane concrete deck bridge with a 60m span through truss superstructure, including guardrails and approaches....

Design and construction of a 36m long single span bridge over the Pakihi River. Works included construction of abutment piles, supply and installation of structural steel and supply and install precast deck and insitu deck topping slab....