LOCATION Lake Road, Rotorua    PRINCIPAL Rotorua District Council   PROJECT DATES November 2011 to October 2012

Construction of two 22.7m span bridges over the Utuhina stream – abutments, wingwalls, steel driven piles, hollow core beams, barriers and handrails. Supply and installation of precast box culverts.

Quality:  CSL Project Quality Plan was produced and followed in accordance with our AS/NZS ISO 9001:2008 certification. There were no significant defects of remedial works required.

Health & Safety:  Health and Safety Plan implemented and observed in accordance with the company’s secondary level requirements for ACC WSMP. There were zero LTIs or serious incidents.

Traffic Management:  A specific traffic management plan was produced for this project.