23 Aug Lake Road Four Laning
LOCATION Lake Road, Rotorua • PRINCIPAL Rotorua District Council • PROJECT DATES November 2011 to October 2012
Construction of two 22.7m span bridges over the Utuhina stream – abutments, wingwalls, steel driven piles, hollow core beams, barriers and handrails. Supply and installation of precast box culverts.
Quality: CSL Project Quality Plan was produced and followed in accordance with our AS/NZS ISO 9001:2008 certification. There were no significant defects of remedial works required.
Health & Safety: Health and Safety Plan implemented and observed in accordance with the company’s secondary level requirements for ACC WSMP. There were zero LTIs or serious incidents.
Traffic Management: A specific traffic management plan was produced for this project.