Construction of a 100m long overbridge which joins Wigram Rd and Magdala Pl. Works involved the construction of a seismically low damage bridge which required an Innovative approach to construction and is the first bridge in the world to adopt this low-damage technology....

Bridge widening of the Historic 1925 Gladstone Bridge (originally built using wood in 1885). A 1.5m widening to provide a shared path using prefabricated cantilevered concrete slabs.  The 1.5m widening extends the width to create a 3m shared cycle and pedestrian path. ...

Construction of a new bridge located adjacent, parallel and downstream of the existing Wharekahika Bridge.  Work associated with the new bridge construction included site clearing, excavating and filling, bridge construction, guardrail over bridge....

Design and construction of a 21m single span cycleway bridge and approaches, forming part of the national cycleway project. The bridge was constructed with steel driven piles, reinforced concrete abutments, structural steel beams and a timber deck and handrails....

Design and construction of rail and road bridges as part of the SH2 realignment at Tutira, north of Napier. The rail-over-road bridge consisted of a 40m concrete structure, utilising precast walls and roof with an insitu topping. ...

Replacement of a live rail bridge: 40m long two span steel beam bridge on the east coast main trunk line over a sensitive waterway. Works included the construction of 6 x 1200Ø x 33m deep permanent cased bored piles with bottom driven plugs and insitu...