23 Aug Ashley River Bridge Replacement
Design and construction of a 300m long, 10 x 30m span bridge over the Ashely River. Permanent cased bored piles and approach works....
Design and construction of a 300m long, 10 x 30m span bridge over the Ashely River. Permanent cased bored piles and approach works....
Construction of a 100m long overbridge which joins Wigram Rd and Magdala Pl. Works involved the construction of a seismically low damage bridge which required an Innovative approach to construction and is the first bridge in the world to adopt this low-damage technology....
Construction of two 22.7m span bridges over the Utuhina stream - abutments, wingwalls, steel driven piles, hollow core beams, barriers and handrails. Supply and installation of precast box culverts....
Construction of a new bridge located adjacent, parallel and downstream of the existing Wharekahika Bridge. Work associated with the new bridge construction included site clearing, excavating and filling, bridge construction, guardrail over bridge....
Design and construction of rail and road bridges as part of the SH2 realignment at Tutira, north of Napier. The rail-over-road bridge consisted of a 40m concrete structure, utilising precast walls and roof with an insitu topping. ...
The project works included the rising of the right abutment of the weir, re-contouring of the upstream and downstream approaches to this abutment, widening of the river channel and construction of a single lane concrete farm bridge. Due to adverse weather conditions the project works...
Design and construction of two 100m long x 3 span bridges over the Mangawhero River, 250,000m³ of earthworks including 60,000m³ of rock excavation. Works also included the design and build of two reinforced earth retaining walls up to 12m high, 1.6km of pavement and associated...
Design and construction of an 85m long network arch bridge with precast/insitu reinforced concrete deck over the Whangaheu River. Works included construction of 0.9m diameter permanent cased abutment piles, supply and installation of structural steel, supply and install precast deck and insitu deck topping slab....
Construction of a 146m long, 3 No x 46m spans, fabricated steel I beams c/w thermal metal arc spray, and a precast concrete deck. CSL offered the client a precast alternative to the insitu concrete deck, which shortened the construction period by 9 weeks....
Construction of a 30m single span 2 lane bridge, comprising of steel beams and concrete deck....