Construction of a 100m long overbridge which joins Wigram Rd and Magdala Pl. Works involved the construction of a seismically low damage bridge which required an Innovative approach to construction and is the first bridge in the world to adopt this low-damage technology....

Construction of a new bridge located adjacent, parallel and downstream of the existing Wharekahika Bridge.  Work associated with the new bridge construction included site clearing, excavating and filling, bridge construction, guardrail over bridge....

Design and construction of rail and road bridges as part of the SH2 realignment at Tutira, north of Napier. The rail-over-road bridge consisted of a 40m concrete structure, utilising precast walls and roof with an insitu topping. ...

Design and construction of two 100m long x 3 span bridges over the Mangawhero River, 250,000m³ of earthworks including 60,000m³ of rock excavation. Works also included the design and build of two reinforced earth retaining walls up to 12m high, 1.6km of pavement and associated...

Design and construction of an 85m long network arch bridge with precast/insitu reinforced concrete deck over the Whangaheu River.  Works included construction of 0.9m diameter permanent cased abutment piles, supply and installation of structural steel, supply and install precast deck and insitu deck topping slab....

Construction of a 146m long, 3 No x 46m spans, fabricated steel I beams c/w thermal metal arc spray, and a precast concrete deck. CSL offered the client a precast alternative to the insitu concrete deck, which shortened the construction period by 9 weeks....