Design and construction of two 100m long x 3 span bridges over the Mangawhero River, 250,000m³ of earthworks including 60,000m³ of rock excavation. Works also included the design and build of two reinforced earth retaining walls up to 12m high, 1.6km of pavement and associated...

Design and construction of an 85m long network arch bridge with precast/insitu reinforced concrete deck over the Whangaheu River.  Works included construction of 0.9m diameter permanent cased abutment piles, supply and installation of structural steel, supply and install precast deck and insitu deck topping slab....

Construction of a 146m long, 3 No x 46m spans, fabricated steel I beams c/w thermal metal arc spray, and a precast concrete deck. CSL offered the client a precast alternative to the insitu concrete deck, which shortened the construction period by 9 weeks....